Skip to content

Merge pull request #116 from ElDavoo/dependabot/pip/protobuf-5.26.1 #72

Merge pull request #116 from ElDavoo/dependabot/pip/protobuf-5.26.1

Merge pull request #116 from ElDavoo/dependabot/pip/protobuf-5.26.1 #72

Triggered via push March 31, 2024 11:00
Status Failure
Total duration 34s
Artifacts

lint-test.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.9)
Process completed with exit code 1.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
Process completed with exit code 1.
build (3.11)
The job was canceled because "_3_9" failed.
build (3.11)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
Process completed with exit code 1.